Skip to content

chore(deps): bump go.etcd.io/etcd/client/v3 from 3.5.12 to 3.5.15 in /etcd #73

chore(deps): bump go.etcd.io/etcd/client/v3 from 3.5.12 to 3.5.15 in /etcd

chore(deps): bump go.etcd.io/etcd/client/v3 from 3.5.12 to 3.5.15 in /etcd #73

Triggered via pull request July 22, 2024 07:18
Status Failure
Total duration 38s
Artifacts

test-etcd.yml

on: pull_request
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Tests (1.21.x)
Process completed with exit code 1.
Tests (1.20.x)
The job was canceled because "_1_21_x" failed.
Tests (1.20.x)
The operation was canceled.
Tests (1.19.x)
The job was canceled because "_1_21_x" failed.
Tests (1.19.x)
The operation was canceled.