STAR (Smart Traceability of the Activations of Renewable generation flexibilities)

GitHub Actions CI Bugs Code Smells Duplicated Lines (%) Lines of Code Maintainability Rating Reliability Rating Security Rating Technical Debt Vulnerabilities

Development

Kubernetes/helm setup

We use kubernetes to host the application in all our environments, including the dev environment.

On the dev environment, we use clk k8s to install the required dependencies both on the dev host and in the local cluster.

To install clk k8s and create a local cluster, just run these commands:

curl -sSL https://clk-project.org/install.sh | env CLK_EXTENSIONS=k8s bash
clk k8s flow

Running the application

Run tilt with:

tilt up

Tilt:

  • generate the hyperledger fabric configuration
  • builds the docker images of the application
  • instantiates the kuberentes resources of the appliaction

Once done, the application is available at https://rte.localhost

Keycloak is available at https://rte.localhost/auth . The keycloak admin is kcadmin and the password is 99f194b95dbc433d2db8 in the dev environment.

By default, the HLF resources of the 3 organizations are created, but not the backend and frontend resources — only the resources for RTE are. The name of the organizations can be passed to tilt to choose the organizations to instantiate.

tilt up -- enedis

starts only the enedis backend and frontend.

tilt up -- enedis producer rte

starts the backend and frontend for the 3 organizations.

Shuting down the application

tilt down

to shutdown the application.

Useful command when working with certificates

wget https://github.com/fullstorydev/grpcurl/releases/download/v1.8.5/grpcurl_1.8.5_linux_x86_64.tar.gz
tar xvzf grpcurl_1.8.5_linux_x86_64.tar.gz
./grpcurl -insecure peer1-hlf-peer.rte:7051 list
apk add openssl
echo | openssl s_client -connect peer1-hlf-peer.rte:7051 2>/dev/null | openssl x509 -text
./grpcurl -cacert /var/hyperledger/tls/server/cert/cacert.pem peer1-hlf-peer.rte:7051 list
openssl x509 -text -in hlf/generated/crypto-config/peerOrganizations/rte/peers/peer1.rte/tls/server.crt

Deployed environments

testing

https://enedis.testing.star.eniblock.fr/

https://producer.testing.star.eniblock.fr/

https://rte.testing.star.eniblock.fr/

staging

https://enedis.staging.star.eniblock.fr/

https://producer.staging.star.eniblock.fr/

https://rte.staging.star.eniblock.fr/

Making a release a production

Each release is production must be tagged. The CI checks that the tag and the version number in the Chart.yaml file are exactly the same, so first make sure Chart.yaml contains the expected version.

Then create a tag, normally on the staging branch

git checkout staging
# check the version in ./helm/star/Chart.yaml
git tag -m 1.2.1 1.2.1
git push --tag

Once the artifact are ready, trigger a deployment on the production environments by merging the tag in the prod.

git checkout prod
git merge --ff-only 1.2.1
git push

Make sure a reviewer is accepting the deployment in github actions.

Finally, bump the version number in Chart.yaml to the next expected version.